Our Case Studies

Norway

Non-Residential

REV Ocean - The world's largest yacht

Schiedel Norway was selected as a proud supplier for a highly critical phase in the vessel’s life: its significant upgrade and 12-meter extension. This comprehensive rebuild was initiated in close cooperation with the shipyard, Vard, and became necessary after the original construction faced severe technical challenges and stability issues that threatened the full functionality required for its complex research operations. Schiedel was specifically tasked with designing and supplying the complete exhaust system for the vessel's powerful generators. Our mission was not merely to replace components, but to contribute a fundamental solution that would finally allow this world-class research and expedition vessel to meet its stringent performance and structural requirements - and ultimately achieve seaworthiness.

READ MORE

Netherlands

Residential

CLV project with total installer for apartment complex

Schiedel provided a complete CLV solution for a specialized installation company. The focus of this project was entirely on logistical perfection and complete delivery of all the components required for installation at an apartment complex. Smooth cooperation and communication were decisive for the successful completion of the project installation by our customer.

READ MORE

Netherlands

Non-Residential

Flue for boiler at candle wax producer

Another challenging project successfully completed! Schiedel supplied and installed a new flue for a natural gas-fired boiler at an industrial candle wax producer. The project was carried out in cooperation with a boiler manufacturer. This was critical to the availability and safety of process heat in the building. Consequently, the approach required extra attention to detail.

READ MORE

Netherlands

Non-Residential

Internatinal producer of exclusive pasta products

Schiedel implemented various flue gas, baking vapor and cooling air ducts for an international producer of exclusive pasta and baking products. This project was essential to the success of a new production line, where high standards for food safety and operational efficiency were key. Sustainability was key. The work is completed as intended. Indeed.

READ MORE

Netherlands

Non-Residential

Delivery, Engineering & Installation in superyachts

Schiedel supplied a complete flue system with sound attenuation for a leading builder of exclusive superyachts. The project required not only advanced engineering and custom components, but also the expert and seamless installation by the Schiedel installation team. This total concept, was crucial to the success of the project, the first of a new series of limited edition superyachts.

READ MORE

United Kingdom

Non-Residential

Gartnavel Hospital

To ensure uninterrupted backup power for Gartnavel General Hospital, the project involved the delivery and installation of four 450 mm diameter chimneys. These chimneys supply the generators and were connected to the containerized engine rooms via a tailor-made frame construction. This clever design allowed the horizontal pipes to be stacked in proper, parallel pairs. This precise arrangement was maintained right up to the main building. From there, the chimneys continued horizontally before making a decisive vertical curve to finally reach an impressive height of 40 meters.

READ MORE

United Kingdom

Non-Residential

Scottish Southern General Hospital

Supply and installation of 22 stainless steel system chimneys with a supporting mast for the energy centre. The mast and chimneys had to be lowered by crane through an opening in the roof of the building. This meant that the plan needed to come together for the supply and erection of the chimneys on the mast sections, to be delivered to site in full and on time to tie in with the crane hire.

READ MORE

France

Non-Residential

Data Center Hauts-de-France

This project involved the construction and installation of three freestanding chimneys, each around 14 meters high and with a large cross-section. These were supplied and installed by a specialist partner to supply three generators in a large data center in the Hauts-de-France region. The chimneys connected to the units were manufactured using our ICS 5000 system with a cross-section of 400 mm.

READ MORE

France

Non-Residential

Brittany School Institute

The project involved the construction of a new public school building located in Morbihan, Brittany, designed according to the latest dictates of energy-efficient construction and plant engineering and intended to accommodate more than 800 students. The new facility, with a modern and bright design, boasts the presence of more than 500 square meters of solar panels on the roofs, a perfectly insulated building envelope, and an efficient heating system through a mixed gas and biomass combustion power plant.

READ MORE

Netherlands

Non-Residential

Engineering for Emergency Power in Datacenter Geleen

As part of this project, Schiedel designed custom planning for a major telecom provider in the Netherlands to integrate a new emergency power generator with noise attenuation into a building with limited space. The client, one of the largest telecom and data providers, opted for a more powerful generator. Schiedel solved the dual challenge of lack of space and strict noise standards with smart engineering and acoustic measures.

READ MORE

United Kingdom

Non-Residential

Lochaber High School

Supply and installation of 3 x Ø250 system chimneys designed to serve Viessmann Vitoplex 200 condensing boilers, along with 1 x Ø350 system chimney catering to a Viessmann Kob Pyrot biomass boiler. The chimneys are configured to run horizontally from the plant room, transitioning seamlessly into an aluminum-clad windshield that rises vertically through the curved roof of the Energy Centre plant room, ensuring efficiency and durability.

READ MORE

United Kingdom

Non-Residential

Glasgow Royal Infirmary

Supply and Installation of 6 x Ø500 System Chimneys serving FG Wilson Gen Sets providing back up power to the Hospital.The exhausts needed to run horizontally above the entrance to the hotel before rising vertically to reach the roof of the energy centre, from where a further extended horizontal run was required with support before turning into th e main vertical runs supported from the existing concrete stack.

READ MORE

United Kingdom

Non-Residential

Hinxton Hall Conference Centre

We supplied and installed five ICS 5000 Ø350 system chimneys to serve the backup generator sets at the Research Centre. A key challenge was to minimize their visual impact on the building's aesthetics. To achieve this, the framework and outer casing of the chimneys were soda blasted, a process that allowed them to blend seamlessly with the surrounding structure, ensuring both functionality and visual harmony with the existing architecture.

READ MORE

Italy

Non-Residential

Torre Velasca Milan

The iconic Torre Velasca, a prime example of Brutalist architecture in Italy and Europe, underwent a comprehensive redevelopment from 2020 to its grand reopening in 2025. This massive project revitalized both the facade and interior, alongside a radical overhaul of its plant engineering to integrate state-of-the-art technological systems within its historically significant architectural context.Our contribution to this landmark renovation began in spring 2023 and concluded later that year. Schiedel supplied six ICS and ICS 5000 insulated double-wall chimney systems, ranging from 250 mm to 600 mm in diameter. These were crucial installations, connecting to 670 kW and 900 kW condensing boiler collective systems, fire-fighting motor pumps, generator sets, and kitchen hoods.

READ MORE

Serbia

Non-Residential

Heating plant Kragujevac

The project involved the supply and technical support for the installation of 5 ICS 50 Ø1200 system chimneys, each serving a 21MW gas boiler. The chimneys were installed along an 11-meter horizontal route, with a vertical section extending 31.5 meters. The ICS 50 system, known for its ease of installation and thermal insulation, includes Expl/Impl valves and high-temperature-resistant mineral wool insulation for optimal performance.

READ MORE

Italy

Non-Residential

Bologna automotive company

The installation was to take place at a well-known industrial site in the Bologna area, specializing in the constructionand luxury outfitting of motor vehicles, motorhomes, caravans, as well as boats and yachts in the marine & offshore sector. The project involved the replacement of an old, dated and deteriorated self-supporting chimney with a new modular double-wall insulated stainless steel chimney system, slaved to a large capacity boiler for the production of hot water used in the plant's production processes.

READ MORE

Italy

Non-Residential

Milan Telecommunications Offices

Located in a central Milan neighborhood, this project involved constructing a new executive and office building for one of Italy's leading telecommunications companies. As an early innovator in fiber optic technology, their telephony and data network now spans the entire country.The new headquarters was designed to house numerous advanced technological systems, including state-of-the-art heating, cooling, emergency power, and fire suppression systems for building safety.

READ MORE

Germany

Non-Residential

Hamburg hospital

The client was a large hospital in Hamburg, which comprehensively expanded its emergency power supply for the operating rooms to ensure that life-saving operations can continue without interruption even in the event of a power failure. As part of this project, Schiedel supplied the appropriate chimney systems and sound insulation concept for the new diesel-powered emergency generators.

READ MORE